Public Comment Period Closed

June 20th, 2012 Comments off

The 45-day public review period for Standard 100-2006R closed on June 18, 2012. There are 139 comments from 18 commenters; 19 of those comments are Supportive.

We will be addressing the comments in subcommittee and main committee meeting in San Antonio. Meeting info can be found here.

Here is the Public Review Draft Copy.

Updates from ASHRAE HQ Interim Meeting

May 26th, 2011 Comments off

Meeting to Review Comments

SPC 100 met in Atlanta at ASHRAE headquarters today to begin the process of reviewing comments from the APR review. A total of 197 comments were received, with most being detail oriented rather than larger, philosophical issues.

The committee took up two questions that came up frequently in the comments:

  1. Should the standard include Residential buildings, and if so, should they be treated in a separate section or sections?
  2. Should the bulk of the O&M section (Section 6) be moved to an Annex

On the first question, we decided to break out Residential buildings into a distinct section of the document. This should make it easier to use and easier to review for those who focus on the residential market.

On question 2., the committee decided to move much of Section 6 (6.2 and onward) into a normative annex. Since it is normative, it is still required for compliance, but the text in the main body of the standard will be shorter, and more clear. Our intent is to make the main body of the text reflect the primary goals of the standard and not to over-emphasize O&M. The committee has consensus that strong O&M practices are essential to energy efficient operation of buildings.

Hate to See Jeff Go

We are all saddened to learn of the passing of Jeff Park, former member of SPC 100. Jeff was a great guy to work with and we all miss his presence enormously. Friends of Jeff can see pictures, offer messages to family members, and make donations at www.jeffparksjourney.com.

Floor Area Standardization

February 22nd, 2011 Comments off

There has been a lot of discussion of late regarding a unified definition for floor are to be used to calculate EUI. Here is a compilation of the info that I have on the subject to date.

If you have other relevant info for the discussion, please email to webmaster@tc76.org and I will post it.

Current definition in the standard is from Std-105-2007a:

gross floor area: the sum of the floor areas within the building, including basements, mezzanine and intermediate-floored tiers, and penthouses with headroom height of 7.5 ft (2.28 m) or greater. It is measured from the exterior faces of exterior walls or from the centerline  of walls separating buildings but excludes covered walkways, open roofed-over areas, porches and similar spaces, pipe trenches, exterior terraces or steps, chimneys, roof overhangs, and similar features.

Thanks Michele

February 2nd, 2011 Comments off

Many thanks to Michele Friedrich who will be stepping down as chair of SPC 100. Our committee members and ASHRAE offer our thanks for all the hours of service that you’ve put in on our behalf.

Rick Hermans will be taking over as the new SPC 100 chair.  Gordon Holness will now serve as vice chair. We offer our congratulations (and condolences ; – ) to you both.

Updated Schedule

October 26th, 2010 Comments off

Based on a revised plan to include an Advisory Public Review  (APR) comment period, our new schedule is (roughly):

  • Send Standard 100 out for APR in December or January
  • Revise Standard 100 using comments from APR
  • Vote for Standard 100 Public Review Draft in June (just prior to Montreal)
  • Possible Spring Interim meeting – TBD – Portland?

Denver Interim Meeting

October 1st, 2010 Comments off
Committee members at interim meeting in Denver

Meeting attendees at interim meeting in Denver

Front (from left to right) Dennis, Glenn, Jim, Michele, Jeff, Cedric and Alex.

Back (from left to right) Dale, Michael, Susan, Wayne, Ray, Adrienne, Gordon and Dunstan.

Draft Timeline

May 19th, 2010 Comments off

Draft Timeline (2010-11) (not yet approved)

2010

June 22 Sections 50% draft complete

Jun 29 Sections 50% draft review (Summer ASHRAE Meeting)

Aug 31 Sections 75% draft complete

Sep 30 100% Draft standard completed

Straightened out. Include appendices. Include definitions.

Sep 30-Oct 1 Interim meeting and 100% draft review

Nov 23 SPC 100 vote to approve standard for public review

Dec 31 Submit draft package to ASHRAE for public review.

2011

Feb 1         Las Vegas ASHRAE Meeting- There will be a main committee meeting, but we may or may not need WG meetings.  Would like to present another SPC 100 update seminar.

Feb 15 Last date for SPC 100 draft standard package due to ASHRAE for spring 2011 public review.

Upcoming events

March 31st, 2010 Comments off

The following are upcoming events affecting SPC 100:

  • Presentation of EUI benchmark methodology
    by Terry Sharp
    on April 9, 9 am (PDT), noon (EDT). This will be a web meeting. Mark your calendar
    and check your inbox for an invitation.
  • Interim meeting
    April 22: 8 am- 5 pm,
    April 23: 8 am-3 pm (CDT)
    Embassy Suites, Chicago O’Hare.
    Be there or be non-compliant.
  • Seminar: “Standard 100 Revision Overview”
    Sunday, June 27, 2010 from 8:00 AM to 9:30 AM
  • Summer Meeting
    June 29, 2010 Albuquerque, NM
    8 am – 12:30 pm (MDT).

Stay tuned…

Countdown to Orlando

December 1st, 2009 Comments off

Work continues on refining the compliance path and outlining specific sections of the new standard. Current efforts are focused on tasks assigned to individual subcommittees organized by section.

  1. Section 5 Energy Survey and Target – Alexander Zhivov
  2. Section 6 Operation and Maintenance – Cedric Trueman
  3. Section 7 Audits – Jim Kelsey
  4. Section 8 Implementation and Verification – Dennis Landsberg
  5. Section 9 Alternate Prescriptive Path

Each section should be working towards:

  1. A process flowchart that organizes the approach within the section.
  2. An outline for the section.

Subcommittee chairs should plan on two meetings between now and the Orlando meeting.

Draft Outline

July 15th, 2009 3 comments

Michele has circulated a draft outline for the standard which can be found here and in the resources list. Comments on the outline are due by Wed., July 22. She has requested a teleconference for July 28 at 10 am PDT, 11 am MDT, noon CDT, 1 pm EDT for 1.5 hours.

We are targeting an interim meeting for August 26-27 at Honeywell in Minneapolis MN.

If you’re looking for information about Yammer, see the page under “About” in the top menu.